Description
0959 Complete refurbishment with rear and loft extension in Hammersmith
Scope
We started this redesign in 2019 and construction commenced soon thereafter. Our contractor encountered quite a few issues during the initial construction. Namely, he had to dig down way over 1.5m to find the drains to connect to them, and since there was no information available to us where they were, the site ended up pretty much completely dug out.
We took this opportunity to strip out the whole existing suspended timber floor and install a brand new insulated concrete subfloor and underfloor heating.
Construction finished in early 2020.
The other two houses are :
0667 Traditional refurbishment and extensions in Hammersmith
1061 Contemporary refurbishment and extensions in Hammersmith

0959-Complete-refurbishment-with-rear-and-loft-extension-in-Hammersmith-vorbild-architecture-001

0959-Complete-refurbishment-with-rear-and-loft-extension-in-Hammersmith-vorbild-architecture-002

0959-Complete-refurbishment-with-rear-and-loft-extension-in-Hammersmith-vorbild-architecture-003

0959-Complete-refurbishment-with-rear-and-loft-extension-in-Hammersmith-vorbild-architecture-004

0959-Complete-refurbishment-with-rear-and-loft-extension-in-Hammersmith-vorbild-architecture-005

0959-Complete-refurbishment-with-rear-and-loft-extension-in-Hammersmith-vorbild-architecture-006

VORBILD Work Stages
Pre-application advice and submission | Historic property design | Marine and yacht design

If you like this project and would like us to help you with yours - we will be happy to advise on time scales, costs, and details –
info@vorbild.co.uk or use our online form to contact us.
Related